Yerevan Metro

Yerevan Metro
Overview
Locale Yerevan, Armenia
Transit type Rapid transit
Number of lines 1
Number of stations 10
Website Yerevan Metro
Operation
Began operation 1981
Operator(s) Ministry of Transport and Communication of Armenia
Number of vehicles 70
Technical
System length 13.4 km (8.3 mi)
Track gauge 1,524 mm (5 ft)
Electrification Third rail, 825V DC
Top speed 90 km/h (56 mph)

System Map

Yerevan Metro Line

TimeLine

Segment Date opened Line
Barekamutyun–David of Sasun March 8, 1981 1
David of Sasun–Gortsaranain July 11, 1983 1
Gortsaranain–Shengavit December 26, 1985 1
Shengavit–Garegin Nzhdeh Square January 4, 1987 1
Shengavit–Charbakh December 26, 1996 1

Name Changes

Station Previous name(s) Years
Marshal Baghramyan Saralandzhi 1981–1982
Republic Square Lenin Square 1981–1992
Garegin Nzhdeh Square Spandaryan Square 1987–1992
General Andranik Hoktemberyan 1989–1990